Now that the exterior is just about finished on the barn, work has begun on the interior. The left side of the barn is designed for a workshop. This has been insulated and will be heated as well as cooled. Here is a photo of the metal walls that have been installed. Safety is key, so these should help in fire prevention in the shop.
No comments:
Post a Comment